Klinge Corporation has opened its revamped and updated production area.
Covering 54,000 square feet, the manufacturing space features newly painted floors, walls, and ceilings. A new testing room, management offices, and welding and fabrication areas are planned for installation in the next few months.
The production area is completely reorganized and streamlined for for higher-capacity output. A new product transfer shaft has been constructed for easy movement from final assembly/testing to installation bays. To reduce dirt due to propane dust, all electric standups and forklifts are used. Overhead LED lighting is also situated throughout the facility.
Additionally, the new production area will use wireless connectivity for online computers and tablets, allowing for real-time access to drawings.
Culminating the shift to the new streamlined production area was a member tour hosted by World Trade Center Harrisburg. The World Trade Center Harrisburg and MANTEC have partnered on a series of company tours showcasing their members and clients who excel in international trade and innovation. The tour was held October 29 at Klinge’s York PA headquarters.
Klinge is a provider of specialized transport refrigeration and power generation equipment. Founded as a spin-off of the Transport Refrigeration Equipment department of York International, Klinge has been producing refrigeration equipment at its York manufacturing facilities and headquarters for 29 years.
For more information, go to www.klingecorp.com.